Month 11 of Building a Home with Pulte at Babcock – Subflooring Upstairs
I wrongly assumed that the holiday season would be a very slow & unproductive time for the building process of our home. So much progress took place last month and the momentum is continuing into the new year!
We now have a second floor!
When I went to the homesite today, I was surprised to see a “roof” and that all the rough framing and sub flooring had been installed on the second floor loft.
I was able to walk around upstairs!!!