Building Our Dream Home: Month 10 – Concrete walls and first-floor plumbing connections

It’s beginning to look a lot like a house!

Concrete walls are up and the first-floor plumbing connections have been installed, including drains, sewer, and water taps. It finally looks like something recognizable.

Here is a look at the outline of the house:

Month 10 of Building a Home with Pulte at Babcock Ranch-2

Month 10 of Building a Home with Pulte at Babcock Ranch | Mandy Carter | Home on our Ranch | Acupful.com
Share the love

Leave a Reply

Your email address will not be published. Required fields are marked *

Like
Close
Copyright © 2023 A CUPFUL

Black Koi Design & Media
Close
Popular Search: